Design visit
We listen before we draw
Every garden starts with a design visit, where we walk the space with you.

How it works
From a walk round to a planting scheme
After the visit you get a scaled plan and a planting scheme. Design takes three to four weeks; most builds take four to eight weeks.
- 01A design visit, £150, taken off the design fee
- 02A scaled plan and a planting scheme
- 03Built by the same team that designed it
Good to know
Do you only do whole gardens?
Mostly, but we're happy to talk about a terrace or planting on its own.
How long does a garden take?
Design takes three to four weeks. Most builds take four to eight weeks.
Book a design visit
Tell us a little about the space and we'll be in touch to arrange a time.
Mon–Fri 8:00–17:30
Areas Cambridge, Grantchester, Histon, Saffron Walden, Ely, Royston